A contractor says a job is done, and the only way to know for sure is to drive out and check — or trust it and hope. Repairs that are assigned but never tracked to completion tend to stall in the middle: started, then forgotten, then only remembered when the tenant calls again. Closing that gap doesn't require more phone calls, it requires a status that moves through defined stages and evidence that the job actually happened. This guide covers how to track a repair from assignment to verified completion without chasing anyone for an update. If you want a system that tracks every job automatically, book a demo.

Contractor Accountability

Assigned Isn't Done. Track It Until It Actually Is.

A status that moves from open to completed, with photo evidence at the end — no more calling to ask "is it done yet?"

Three Stages, Always Visible

1

Open

Job assigned, work hasn't started


2

In Progress

Contractor is on site or working the job


3

Completed

Work finished and verified

Verified, Not Just Claimed

"Done" from a contractor is a claim. A photo attached to the closed job is evidence. Requiring a completion photo before a job moves to "Completed" means anyone reviewing the record later can see the actual result, not just take someone's word for it.

Before

📷 Leaking pipe under sink, water pooling on cabinet floor

After

📷 Pipe replaced, cabinet floor dry, no visible leak

Attached to Service Order #0388 — closed by Ray's Plumbing

What Slows a Repair Down in the Middle

No one knows whose turn it is

Without a clear owner, a job assigned to a contractor sits waiting on a step nobody's tracking.

Parts on order, status unchanged

A repair waiting on a part looks identical to one that's simply stalled — unless the status says why.

Completion reported, never confirmed

A verbal "it's done" with nothing attached leaves no record to check back against later.

See Every Job's Status Without Calling

HomeInspecto tracks each repair from open to completed, with photo proof attached at close.

Frequently Asked Questions

Can a contractor update the status themselves?

Yes — a contractor with access to the job can move it from open to in progress to completed, so the record stays current without someone else relaying updates.

What happens if a contractor marks a job complete without a photo?

The completion step can require a photo before the status is allowed to change, so a job can't be closed out without evidence attached.

Can I see how long a repair actually took from start to finish?

Yes, since each status change is timestamped, the full timeline from assignment to completion is visible on the order.

Does this work with contractors who aren't tech-savvy?

Updating a status and attaching a photo is a simple enough action for most contractors to handle directly from a phone, without needing training.

Know It's Done — Don't Just Hope It Is

Track every repair from assignment to verified, photo-backed completion.